Meirina, Restu Puspa (2019) Analisis Faktor Penyebab Keterlambatan Penjadwalan Penyelesaian Proyek Konstruksi Gedung Bertingkat. Undergraduate thesis, Universitas Pembangunan Jaya.
Full text not available from this repository.Item Type: | Karya Tulis Ilmiah (KTI) (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknologi dan Desain > Teknik Sipil |
Depositing User: | Admin Repository |
Date Deposited: | 05 Mar 2020 03:44 |
Last Modified: | 10 Mar 2020 04:57 |
URI: | http://eprints.upj.ac.id/id/eprint/16 |
Actions (login required)
View Item |