Adiati, Nataya and Pahlawan, Adhie (2024) Metode Pelaksanaan Pekerjaan Struktur Atas pada Proyek Pembangunan Gedung Hotel dan Kantor - Soll Marina. Undergraduate thesis, Universitas Pembangunan Jaya.
Text
1. HALAMAN JUDUL .pdf Download (90kB) |
|
Text
2. ABSTRAK .pdf Download (153kB) |
|
Text
3. ABSTRACT.pdf Download (79kB) |
|
Text
4. ORISINALITAS.pdf Download (117kB) |
|
Text
5. PENGESAHAN.pdf Download (570kB) |
|
Text
6. PRAKATA.pdf Download (150kB) |
|
Text
7. DAFTAR ISI.pdf Download (158kB) |
|
Text
8. DAFTAR TABEL.pdf Download (98kB) |
|
Text
9. DAFTAR GAMBAR.pdf Download (159kB) |
|
Text
10. DAFTAR LAMPIRAN.pdf Download (102kB) |
|
Text
11. BAB I.pdf Download (397kB) |
|
Text
12. BAB II.pdf Download (1MB) |
|
Text
13. BAB III.pdf Download (4MB) |
|
Text
14. BAB IV.pdf Download (81kB) |
|
Text
15. DAFTAR PUSTAKA.pdf Download (77kB) |
|
Text
16. DAFTAR RIWAYAT HIDUP.pdf Restricted to Repository staff only Download (636kB) |
|
Text
17. LAMPIRAN - LAMPIRAN.pdf Download (8MB) |
|
Text
18. BERITA ACARA UNGGAH MANDIRI.pdf Download (1MB) |
|
Text
19. BUKTI LOLOS PLAGIARISM.pdf Download (491kB) |
Abstract
This course aims to provide an overview and opportunity for students to do professional work, jump directly, and contribute directly and be involved in the construction process in the construction field. In other words, students are given freedom in choosing agencies or companies to do professional work. Professional work will be carried out with a minimum requirement of 400 hours or for approximately two months. This professional work activity will discuss the construction project of the hotel and office building - soll marina which is currently still in the structural construction stage under the auspices of its workmanship by PT. Totalindo Eka Persada which is located in the Alam Sutera Serpong area, South Tangerang. This practical work will discuss the work or implementation of the upper structure which includes column, beam and floor plate work and until the casting stage is carried out. The construction of this construction project has a scope in zones 1 and 2, with the work always starting from the work of floor slabs and beams and continuing with column work. In addition, the discussion will also include an understanding of the problems that arise and how the improvement method will be carried out during the construction of the project.
Item Type: | Karya Tulis Ilmiah (KTI) (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknologi dan Desain > Teknik Sipil |
Depositing User: | Nataya Adiati |
Date Deposited: | 17 Jul 2024 08:10 |
Last Modified: | 17 Jul 2024 08:12 |
URI: | http://eprints.upj.ac.id/id/eprint/7250 |
Actions (login required)
View Item |