Saputra, Achmad Rizal and Widayanto, Muhammad Erza (2025) Metode Pelaksanaan Interkoneksi Pipa pada Proyek Relokasi Pipa PDAM Area Stasiun MRT Mangga Besar CP202. Other thesis, Universitas Pembangunan Jaya.
![]() |
Text
Halaman Judul.pdf Download (30kB) |
![]() |
Text
Abstarct.pdf Download (253kB) |
![]() |
Text
Abstrak.pdf Download (201kB) |
![]() |
Text
Pernyataan Orisinalitas.pdf Download (174kB) |
![]() |
Text
Lembar Pengesahan.pdf Download (736kB) |
![]() |
Text
Kata Pengantar.pdf Download (132kB) |
![]() |
Text
Daftar Isi.pdf Download (55kB) |
![]() |
Text
Daftar Tabel.pdf Download (84kB) |
![]() |
Text
Daftar Gambar.pdf Download (64kB) |
![]() |
Text
Daftar Lampiran.pdf Download (85kB) |
![]() |
Text
Bab I.pdf Download (219kB) |
![]() |
Text
Bab II.pdf Download (286kB) |
![]() |
Text
Bab III.pdf Download (2MB) |
![]() |
Text
Bab IV.pdf Download (43kB) |
![]() |
Text
Daftar Pustaka.pdf Download (37kB) |
![]() |
Text
Daftar Riwayat Hidup.pdf Restricted to Repository staff only Download (393kB) | Request a copy |
![]() |
Text
Lampiran-lampiran.pdf Download (1MB) |
![]() |
Text
SPT-I-03-PERPUS-POB-02-F-06 Berita Acara Unggah Mandiri KTI Mahasiswa.pdf Download (1MB) |
![]() |
Text
Bukti Plagiarisme.pdf Download (318kB) |
Abstract
Pembangunan Jaya University, especially the Civil Engineering Study Program, has established a Professional Work program and has become a mandatory subject so that the knowledge gained by students on campus can be adapted or harmonized with the real world of work. On this occasion, the intern carried out professional work on the PDAM pipe relocation project in the Mangga Besar CP202 MRT station area which stretches for 1.8 KM with contractors PT Abadi Haruman Jaya and PT Arkonin as consultants. In this Professional Work, practitioners learn about PDAM pipe interconnection work. Work stages include preparation work, excavation work, installation of pipes and pipe accessories, pipe connection, flushing and hydro test, reconditioning/repairing excavations to casting. During professional work, practitioners are expected to be able to apply the knowledge that has been taught theoretically in class directly into the field, be able to understand the pipe interconnection process, and be able to apply the knowledge that has been received in professional work as a provision when the practitioner enters real work environment.
Item Type: | Karya Tulis Ilmiah (KTI) (Other) |
---|---|
Uncontrolled Keywords: | Pipa PDAM, Proyek MRT Fase 2 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknologi dan Desain > Teknik Sipil |
Depositing User: | Achmad Rizal Saputra |
Date Deposited: | 04 Mar 2025 09:45 |
Last Modified: | 04 Mar 2025 09:49 |
URI: | http://eprints.upj.ac.id/id/eprint/10849 |
Actions (login required)
![]() |
View Item |