Metode Pelaksanaan Interkoneksi Pipa pada Proyek Relokasi Pipa PDAM Area Stasiun MRT Mangga Besar CP202

Saputra, Achmad Rizal and Widayanto, Muhammad Erza (2025) Metode Pelaksanaan Interkoneksi Pipa pada Proyek Relokasi Pipa PDAM Area Stasiun MRT Mangga Besar CP202. Other thesis, Universitas Pembangunan Jaya.

[img] Text
Halaman Judul.pdf

Download (30kB)
[img] Text
Abstarct.pdf

Download (253kB)
[img] Text
Abstrak.pdf

Download (201kB)
[img] Text
Pernyataan Orisinalitas.pdf

Download (174kB)
[img] Text
Lembar Pengesahan.pdf

Download (736kB)
[img] Text
Kata Pengantar.pdf

Download (132kB)
[img] Text
Daftar Isi.pdf

Download (55kB)
[img] Text
Daftar Tabel.pdf

Download (84kB)
[img] Text
Daftar Gambar.pdf

Download (64kB)
[img] Text
Daftar Lampiran.pdf

Download (85kB)
[img] Text
Bab I.pdf

Download (219kB)
[img] Text
Bab II.pdf

Download (286kB)
[img] Text
Bab III.pdf

Download (2MB)
[img] Text
Bab IV.pdf

Download (43kB)
[img] Text
Daftar Pustaka.pdf

Download (37kB)
[img] Text
Daftar Riwayat Hidup.pdf
Restricted to Repository staff only

Download (393kB) | Request a copy
[img] Text
Lampiran-lampiran.pdf

Download (1MB)
[img] Text
SPT-I-03-PERPUS-POB-02-F-06 Berita Acara Unggah Mandiri KTI Mahasiswa.pdf

Download (1MB)
[img] Text
Bukti Plagiarisme.pdf

Download (318kB)

Abstract

Pembangunan Jaya University, especially the Civil Engineering Study Program, has established a Professional Work program and has become a mandatory subject so that the knowledge gained by students on campus can be adapted or harmonized with the real world of work. On this occasion, the intern carried out professional work on the PDAM pipe relocation project in the Mangga Besar CP202 MRT station area which stretches for 1.8 KM with contractors PT Abadi Haruman Jaya and PT Arkonin as consultants. In this Professional Work, practitioners learn about PDAM pipe interconnection work. Work stages include preparation work, excavation work, installation of pipes and pipe accessories, pipe connection, flushing and hydro test, reconditioning/repairing excavations to casting. During professional work, practitioners are expected to be able to apply the knowledge that has been taught theoretically in class directly into the field, be able to understand the pipe interconnection process, and be able to apply the knowledge that has been received in professional work as a provision when the practitioner enters real work environment.

Item Type: Karya Tulis Ilmiah (KTI) (Other)
Uncontrolled Keywords: Pipa PDAM, Proyek MRT Fase 2
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknologi dan Desain > Teknik Sipil
Depositing User: Achmad Rizal Saputra
Date Deposited: 04 Mar 2025 09:45
Last Modified: 04 Mar 2025 09:49
URI: http://eprints.upj.ac.id/id/eprint/10849

Actions (login required)

View Item View Item