Sidiq, Muhamad Ardiansyah and Alisiyah, Ridho Faqih (2023) Metode Pelaksanaan Perkerasan Kaku (Rigid Pavement) Menggunakan Alat Wirtgen Proyek Jalan Tol Serpong - Balaraja Seksi 1B. Undergraduate thesis, Universitas Pembangunan Jaya.
Text
1. Halaman Judul.pdf Download (167kB) |
|
Text
2. Abstract.pdf Download (178kB) |
|
Text
2. Abstrak.pdf Download (178kB) |
|
Text
3. Pernyataan Orisinalitas.pdf Download (109kB) |
|
Text
4. Lembar Pengesahan.pdf Download (320kB) |
|
Text
5. Kata Pengantar.pdf Download (232kB) |
|
Text
6. Daftar isi.pdf Download (238kB) |
|
Text
7. Daftar Tabel.pdf Download (228kB) |
|
Text
8. Daftar Gambar.pdf Download (249kB) |
|
Text
9. Daftar Lampiran.pdf Download (230kB) |
|
Text
10. BAB I.pdf Download (403kB) |
|
Text
11. BAB II.pdf Download (1MB) |
|
Text
12. BAB III.pdf Download (2MB) |
|
Text
13. BAB IV.pdf Download (271kB) |
|
Text
14. Daftar Pustaka.pdf Download (216kB) |
|
Text
15. Daftar Riwayat Hidup.pdf Restricted to Repository staff only Download (180kB) |
|
Text
16. Lampiran-lampiran.pdf Download (2MB) |
Abstract
Professional Work is carried out as a prerequisite forcompleting a Bachelor of Civil Engineering degree at Pembangunan Jaya University. This Professional Work is a means to apply the academic knowledge that has been obtained during the lecture period in the Civil Engineering department. Practical work was carried out at the construction site of the Serpong-Balara Toll Road Section 1B. Practitioners are assigned to the Quality control division of the main contractor, PT Nusa Raya Cipta, with a special focus on the implementation of rigid pavement using Concrete paving Wirtgen tools. The role of the Quality control division is to ensure that the construction work is in accordance with the project design specifications and drawings that have been agreed upon by the project Owner and the consultant team. Practitioners as professional work students in the Quality control division are responsible for field work, specifically overseeing Quality control of rigid pavement construction on ramps and main roads of toll roads. The rigid pavement construction process using Wirtgen equipment includes several stages, including Marking & Stake Out, Dowel installation, concrete pouring, segment cutting, Joint Sealant application, and finishing. At each stage, thorough inspections were conducted to ensure that Quality standards were met and maintained throughout the project. This Professional Work serves as a link between academic learning and application in the world of work, thereby enhancing the practitioner's abilities and providing useful insights into the construction field. This experience reinforces the importance of Quality control in construction projects and prepares practitioners for a career in civil engineering in the future.
Item Type: | Karya Tulis Ilmiah (KTI) (Undergraduate) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknologi dan Desain > Teknik Sipil |
Depositing User: | Muhamad Ardiansyah Sidiq |
Date Deposited: | 30 Dec 2023 07:53 |
Last Modified: | 30 Dec 2023 07:53 |
URI: | http://eprints.upj.ac.id/id/eprint/7296 |
Actions (login required)
View Item |